Project Details
CE Group, an experienced electrical industrial contractor, was hired to provide general lighting and power systems for the extension of a Production and Distribution facility in Ipswich, QLD. The project included electrical work for key production areas such as the Syrup and Post-mix facilities, Flammable and Dangerous Goods Storages, and newly renovated office spaces.
To support the facility’s upgrade, the old site transformer was removed, and two new 2500A Main Switchboards were installed. These switchboards were connected to new 1500kVA Transformers. After that, the existing facility was seamlessly connected to the upgraded switchboards during a planned changeover, ensuring there were no interruptions to the facility’s operations.
Moreover, the team worked under a tight schedule, focusing on minimizing disruptions to ongoing operations. CE Group closely coordinated with all service providers to ensure the smooth integration of the new systems into the existing setup.
Despite the challenging schedule, CE Group successfully delivered the project on time. Their ability to complete the work while keeping the facility running smoothly further showcased their expertise as a reliable electrical industrial contractor.
The extension project at the Ipswich facility demonstrates CE Group’s ability to handle complex industrial electrical work. Their focus on minimizing disruption, staying on schedule, and ensuring operational efficiency solidifies their standing as a trusted electrical industrial contractor.