GRM Riverside Rejects System Refurbishment and Remediation
Goonyella Riverside Mine, Moranbah, QLD

Project Details

CE Group, a renowned electrical mining contractor, was engaged to undertake critical rewiring and replacement of electrical equipment, cabling, and devices on several key systems at the site. These systems included the R1 Conveyor, the 300T Rejects Bin/Belt Feeder, and the R2 Conveyor. Additionally, CE Group provided electrical connections and technical assistance for the installation of a new Radial Stacker, decommissioned the R3 Conveyor, and worked on the Travelling Rejects Stacker.

The scope of work was extensive and required meticulous planning to ensure all tasks were completed on time and to the highest standards. CE Group’s team was responsible for supplying and installing new starter modules into the motor control center (MCC), as well as installing variable voltage variable frequency (VVVF) drives and making all necessary electrical connections. A new demountable switchroom, kiosk transformer, and ring main unit (RMU) were also installed at the Rejects Switchroom, along with the associated high-voltage (HV) cabling.

To ensure minimal disruption to operations, CE Group carried out significant pre-works prior to the major shutdown. This proactive approach allowed the majority of the works to take place smoothly during the designated four-week shutdown period. Strict shutdown conditions were adhered to, with close coordination and interface with other contractors on site. CE Group also played a crucial role in assisting with the technical aspects of the project, ensuring a seamless integration of new systems and equipment.

Throughout the project, CE Group provided a turnkey solution, delivering all aspects of the electrical upgrade from start to finish. The team’s ability to work efficiently under the tight shutdown schedule and their technical expertise helped keep the project on track. The successful completion of this project highlights CE Group’s strong capabilities as a trusted electrical mining contractor, able to meet complex project demands and deliver results under stringent time constraints.

In summary, CE Group’s involvement in the electrical upgrade of the R1 and R2 Conveyors, Rejects Bin, and associated systems was executed flawlessly. Their careful planning, commitment to safety, and expertise in handling large-scale shutdowns ensured the project’s timely and successful completion, solidifying their reputation as a reliable partner in the mining sector.

Summary

Location

Bowen Basin, QLD

Client

Project Completion

2022

Value

4.8M