Karumba Waste Water Plant
Karumba, Queensland

Project Details

CE Group, a trusted electrical water infrastructure contractor, was engaged to provide a comprehensive solution for both the base building electrical and process control systems. The scope of the base building works included the installation of mains, switchboards, generator systems, and UPS supply. Additionally, the project encompassed general lighting, power systems, and lightning protection systems, all of which were critical to the facility’s operational integrity. To ensure the highest quality, CE Group designed and manufactured the switchboards at its Loganholme Head Office factory, maintaining close oversight throughout the process.

In addition to the base building electrical work, CE Group was responsible for delivering the Process Control System. This aspect of the project was managed under a design-and-construct contract, which was guided by a functional description provided by the client. CE Group applied its expertise to develop and implement a system that met all operational requirements while adhering to industry best practices. The plant automation and programming were handled in-house by CE Group’s experienced team, who ensured optimal efficiency and system performance.

Furthermore, CE Group was tasked with the supply and programming of the site SCADA system, a critical component for monitoring and data acquisition. This system allowed for enhanced control and monitoring of the plant’s operations, ensuring reliability and safety.

Thanks to CE Group’s extensive experience as an electrical water infrastructure contractor, the project was completed to the highest standards. By providing a seamless integration of electrical and process control systems, CE Group reinforced its position as a leader in the industry, delivering a solution that met the client’s needs while ensuring long-term operational success.

Summary

Location

 Karumba, QLD

Client

Project Completion

2016

Value

4M