Krones Nu-Pure Beverages – Electrical Installation
Project Details
CE Group was engaged by Krones AG to deliver electrical installation works for production infrastructure at the Nu-Pure Beverages facility in Horsley Park, New South Wales. The project required coordinated electrical delivery within a specialised food and beverage manufacturing environment.
The scope incorporated electrical installation and associated cabling works supporting the new production infrastructure. Delivery required close coordination with the project team and integration with specialist equipment and systems being installed throughout the facility.
Additional works undertaken during delivery included power supply installation, cabling, testing and termination, together with fibre-optic communications infrastructure. These works supported the integration and completion of the broader electrical package.
Project HIGHLIGHTS
- Electrical installation for food and beverage manufacturing infrastructure
- Power and associated cabling works
- Electrical testing and termination
- Fibre-optic communications infrastructure
- Integration with specialist production equipment
- Structured testing, documentation and handover
- Delivery within a process manufacturing environment
Summary
Location
Client
Krones AG
Project Completion
2025
Value
$618K