Schweppes Wulkuraka Facility

CE Group, an experienced electrical industrial contractor, was engaged to provide general light and power systems for the extension of a Production and Distribution facility in Ipswich, QLD. This project included delivering electrical solutions for various critical production areas, such as Syrup and Post-mix facilities, as well as Flammable and Dangerous Goods Storages. Additionally, CE Group provided electrical services for refurbished office spaces, ensuring all areas were fully operational.

To accommodate the facility’s upgrade, the existing site transformer was decommissioned. In its place, two new 2500A Main Switchboards were installed, both fed by newly installed 1500kVA Transformers. This complex installation required precise planning to ensure a smooth transition. The existing facility was reconnected to the upgraded Main Switchboards during a carefully programmed, seamless changeover period. This allowed ongoing operations to continue without interruption.

Furthermore, CE Group was tasked with adhering to a challenging project timeline, which required minimizing disturbances to the existing operations at the facility. As a result, close coordination and communication were essential to the project’s success. The CE Group team worked extensively with all service providers, ensuring the integration of the new systems was both smooth and efficient.

Throughout the project, CE Group demonstrated its expertise as a trusted electrical industrial contractor by effectively managing both the technical and logistical aspects of the installation. Their ability to deliver on time, while minimizing disruptions, contributed significantly to the overall success of the facility’s extension.

In conclusion, the extension of the Production and Distribution facility highlights CE Group’s capabilities in delivering tailored electrical services for industrial projects. By maintaining a strong focus on project timelines, seamless integration, and operational continuity, CE Group solidified its reputation as a reliable electrical industrial contractor in the industry.

Teys Beenleigh WWTP

CE Group and Teys Australia continued with the Beenleigh Waste Water and Bio-Gas Collection project. As a trusted electrical industrial contractor, CE Group was tasked with upgrading the wastewater treatment system at the Teys Beenleigh facility.

JBS Dinmore Lighting

CE Group’s Scope at JBS Dinmore was to replace all the lights in the ceiling, above the Boning Room Floor. The JBS Dinmore Processing Plant is the largest beef plant in the Southern Hemisphere, with a daily production of 3,400 heads per day and an onsite staff base of more than 2,000 team members.

All work for this project was completed during weekend shutdowns, due to the tight timeframes for completion and difficult working conditions during business hours.

Kerry Ingredients Light and Power

E Group’s unique and extensive experience as an electrical industrial contractor in the food and process industry ensured the successful completion of this Light & Power Project at Kerry Ingredients. The project involved the highest standards of workmanship, which CE Group consistently delivers on all projects.

Teys Trim Management Beenleigh

This project encompassed the supply and installation of all Electrical, Communications and Dry Fire services for the construction of a new Trim Line Facility and Carton Store at Teys Australia’s Beenleigh plant.

New Switchboards, Cable Reticulation and Cabling were required, along with food grade Lighting and Motor Connections in the sensitive meat processing area. CE Group also provided Control Systems design and installation for the Cryovac and new Vacuum Pumps.

BAC – DTB Air Circuit Breaker Installation

The Brisbane Airport is responsible for the safe transportation of over 20 million passengers per year. As part of their ongoing commitment to quality, it was deemed necessary to remove and reinstate several of the domestic terminal’s existing Air Circuit Breakers.

CE Group was contracted to perform a series of critical changeovers in the domestic terminal’s main switchboard. The importance of this project resulted in a comprehensively detailed analysis of the work requirements and associated risks surrounding the task.

Hail Creek Industrial Area Upgrade – HV Tyre Bay

The Hail Creek IAU – Heavy Vehicle Tyre Bay project was granted to CE Group based on the exceptional works previously completed on the same site.

This project included the supply and installation of high bay lighting to suit task requirements, office area lighting and the facility’s general power requirements. CE Group also designed, manufactured and installed the various switchboards for the Tyre Facility. Our scope of work included the civil works for the extensive power supply submain run to the Tyre Bay Facility.

APEC Haus,Port Moresby PNG

electrical contractor png apec haus

CE Group, a trusted electrical contractor in PNG, is proud to have contributed to the iconic APEC Haus project.

Angau Memorial Hospital Redevelopment

CE Group, as an electrical contractor in PNG, was engaged to supply and install all electrical services for the Angau Memorial Hospital redevelopment.

Hayman Island – STP

The existing Hayman Island Sewerage treatment plant is located on the south-western side of the island off the coast of Central Queensland and required to be upgraded to meet the high standards of the resort and the growing tourist activity on the island. CE Group were contracted to design, implement and install a new electrically automated sewerage treatment control system.

CE Group’s engineering team were set some challenging design parameters which focused on the reduction of power consumption and environmental durability with no loss to the operation of the resort throughout the construction phase.