BEHIND THE PROJECT | Ti-Tree Power Infrastructure Upgrade

BEHIND THE PROJECT | Ti-Tree Power Infrastructure Upgrade

Engineering and delivering the HV/LV infrastructure behind an operational power station

What does it take to upgrade critical power infrastructure when the new system needs to integrate with an existing operating facility? 

At the Ti-Tree Power Station in Willowbank, Queensland, CE Group is delivering a Design & Construct package spanning detailed engineering, procurement, construction, installation, testing and commissioning of new high-voltage and low-voltage infrastructure. 

The project brings together multiple engineering disciplines and major electrical assets within one coordinated delivery program — from 33kV switchgear and transformer infrastructure through to LV distribution, control systems and the new switchroom. 

From design through to energisation

The project begins well before equipment reaches site. 

CE’s delivery encompasses detailed HV and LV design, control system design and integration, hazardous area design, civil and structural engineering, mechanical design, fire services and building services. 

The engineering process progresses through staged design submissions and reviews, including Safety in Design and HAZOP, before Issue for Construction documentation is released. This creates the technical foundation for procurement, manufacturing and construction to progress as an integrated package. 

Building the new HV/LV infrastructure

At the centre of the upgrade is a new HV/LV switchroom and the electrical infrastructure required to support it. 

The scope includes a new 33kV HV switchboard and extension of the existing 33kV switchboard, together with a new 33kV/433V 1MVA auxiliary transformer. On the LV side, the project incorporates a new 415V main switchboard, Gas Conditioning Switchboard 2, distribution boards, remote I/O panels and supporting power supply and battery systems. 

HV and LV cable installation and reticulation, earth grid extension and associated switchroom infrastructure complete the connection between the major electrical assets. 

Integrating new infrastructure with an existing power station

The complexity of an infrastructure upgrade sits in how the new and existing systems come together.

The project includes modifications to existing station and gas conditioning switchboards, control system integration, as well as decommissioning, demolition and relocation works.

That interface requires electrical, control, civil, structural and mechanical elements to be coordinated around the requirements of the wider power station rather than delivered as isolated packages.

One coordinated D&C delivery

Major equipment moves through procurement and manufacturing, Factory Acceptance Testing and transportation before installation on site. The delivery sequence then progresses through construction, Site Acceptance Testing, testing and commissioning and final handover.  

For CE Group, Ti-Tree demonstrates the depth of capability required to take complex power infrastructure from detailed design through to site delivery – coordinating engineering disciplines, HV and LV systems, switchrooms, transformers, controls and construction as one integrated project.

PROJECT SNAPSHOT

Project: Ti-Tree Power Infrastructure Upgrade – HV/LV Design & Construct

Location: Willowbank, Queensland

Sector: Power Infrastructure

Project Value: TBC

Practical Completion: 2025

CE Group Capability: Design & Engineering | HV/LV Infrastructure | Switchrooms | Transformers | Control Systems | Electrical Construction | Testing & Commissioning

Delivery Environment: Operational Power Infrastructure