BEHIND THE PROJECT | Dalrymple Bay Coal Terminal
Renewing critical electrical infrastructure within one of Australia’s major coal export terminals
How do you replace ageing electrical infrastructure on a conveyor system operating within a terminal that runs 24 hours a day, 365 days a year?
At the Port of Hay Point in Central Queensland, Dalrymple Bay Coal Terminal operates with a capacity of 85 million tonnes per annum, forming part of one of the world’s largest coal exporting ports.
The L3 Conveyor required an upgrade to its existing light and power infrastructure due to the age and degradation of cables and fittings. The works involved replacing the existing infrastructure while integrating new electrical distribution, lighting, power and control systems within the operational terminal environment.
Electrical asset renewal across the L3 Conveyor
The project involved a substantial renewal of the electrical infrastructure supporting the conveyor.
The scope included a new light and power distribution board, modifications to the three-phase supply, replacement walkway and equipment-area lighting, emergency lighting, GPOs, junction boxes, new LV power and control cabling, conduit and associated cable support infrastructure.
Existing redundant lighting, cabling, power circuits and field equipment were progressively decommissioned and removed as the new infrastructure was installed.
Connecting power, lighting and control
The upgrade extended beyond the physical replacement of lighting equipment.
New control cabling was installed to support switching of the L3 lighting contactor circuits, interfacing with the terminal’s existing PLC and SCADA infrastructure for lighting control and monitoring.
The works also included new and replacement lighting across the eastern and western conveyor walkways, metal detector areas and equipment locations, together with new power outlets and electrical distribution infrastructure.
Delivering within an operational terminal
Brownfield electrical upgrades require the new infrastructure to be integrated around assets that remain critical to ongoing operations.
Delivery required coordination around conveyor isolations, electrical shutdowns, working at heights, restricted access and scheduled maintenance periods. The project was planned around a scheduled outage, with shutdown-dependent activities coordinated to minimise interaction with other works occurring across the terminal.
Testing and quality assurance were also integral to the works, including continuity and insulation resistance testing, earth continuity testing, functional testing and earth leakage testing, supported by Inspection and Test Plans and updated as-built documentation.
Electrical capability for complex operating environments
Projects within ports, mines and bulk materials handling facilities require electrical infrastructure that can be safely renewed while working within the constraints of established operational assets.
The L3 Conveyor project brings together switchboard manufacture, electrical construction, lighting and power distribution, control integration, brownfield modifications, shutdown coordination and testing within a major export terminal environment.
PROJECT SNAPSHOT
Project: Dalrymple Bay Coal Terminal – L3 Conveyor Light & Power Replacement
Location: Hay Point, Queensland
Sector: Ports & Bulk Materials Handling
Project Value: TBC
Practical Completion: 2024
CE Group Capability: Switchboard Manufacturing | Electrical Construction | Lighting & Power | Control Integration | Testing & Commissioning
Delivery Environment: Operational Bulk Materials Handling Infrastructure