BEHIND THE PROJECT | Mount Morgan Gold Treatment and Rehabilitation Project
What does it take to establish the electrical and control infrastructure behind a new mineral processing plant while multiple construction packages are progressing at the same time?
At Mount Morgan in Central Queensland, a major rehabilitation project is establishing new processing infrastructure at the former gold mine. The electrical, instrumentation and controls package supporting that plant requires coordinated installation across power distribution, process equipment, instrumentation, communications and control infrastructure.
Connecting power across the process
Electrical infrastructure extends across several distinct processing areas, each with its own equipment and interfaces.
CE Group’s scope brings together HV and LV cabling, transformer and switchroom connections, MCC interfaces, power and control cabling, cable support systems, earthing and lightning protection. This creates the electrical pathways required to connect distributed process equipment back into the plant’s power infrastructure.
For mining projects, that breadth matters. Electrical construction must align with process equipment, mechanical installation, access sequencing, and the requirements of other contractors rather than being delivered as an isolated workstream.
Instrumentation and communications behind plant operation
Modern mineral processing depends on more than power distribution. Instrumentation, control, and communications infrastructure must connect field equipment throughout the plant with the systems used to monitor and control the process.
The Mount Morgan package includes installation and termination of instrumentation and control cabling together with communications infrastructure, including fibre-optic and Cat 6 cabling. Fibre installation includes fusion splicing, while cable routes require appropriate segregation and mechanical protection alongside the plant’s electrical infrastructure.
The distinction is important: CE’s verified scope relates to the installation and testing of control infrastructure, rather than PLC/SCADA programming, which is excluded from the contracted works.
Coordinating EIC construction across a developing plant
Large process-plant projects are built through interconnected work fronts. At Mount Morgan, access to electrical infrastructure and individual processing areas was programmed progressively, requiring EIC activities to align with other equipment suppliers and construction contractors.
The contractual program identifies staged access through the mill, CIL, reagents, water services, resin/copper/cyanide, copper recovery and non-process infrastructure areas before pre-commissioning and commissioning activities.
This delivery environment places emphasis on construction planning, interface management, and maintaining clear records as systems progress from installation into testing and handover.
Building assurance into electrical construction
Testing and documentation are integral to the package. Inspection and test records, traceable test results, as-built information and quality documentation provide evidence that installed systems conform to project requirements.
The Company’s team retains responsibility for on-load wet and dry commissioning, while CE provides qualified personnel to support commissioning activities and address installation-related issues. This scope boundary demonstrates the importance of clearly defined responsibilities as a mineral processing project transitions from construction into operation.
PROJECT SNAPSHOT
Project: Mount Morgan Gold Treatment and Rehabilitation Project
Location: Mount Morgan, Central Queensland
Sector: Mining & Resources
Project Value: Not included – TBC / approval required
Practical Completion: 2026 (contractual milestone)
CE Group Capability: EIC Installation | HV/LV Electrical | Instrumentation & Control Infrastructure
Delivery Environment: Major mineral processing and mine rehabilitation project with staged construction interfaces