Unitywater Regional Arc Flash Rectification Works
Assess 5 major switchboards at Unitywater STPs and determine any Arc Flash risk and suggest and implement mitigation, including new switchboards, remote switching of main breaker, or addition of an ACB (Air Circuit Breaker) with remote switching to reduce or remove risk to personnel.
Arc Flash Mitigation Electrical Panel Arrangement
CE Group, a trusted electrical water infrastructure contractor, was engaged to perform essential upgrades at the Unitywater Sewage Pump Station sites. These upgrades included the comprehensive design, manufacture, supply, installation, and commissioning of a state-of-the-art sewage pump station switchboard, as well as the associated electrical, mechanical, and civil works required for the project’s success.
Virgina Branch Sewer Augmentation Project – Cannery Creek
CE Group undertook the design, manufacture and supply of the first arcSAFE switchboard
BMA Goonyella Riverside Mine Fire & High Pressure Water Upgrade
BHP Mitsubishi Alliance (BMA) operates the Goonyella Riverside Mine (GRM), located approximately 35 kilometres north of Moranbah in Queensland. This mine produces around 7.5 million tonnes per annum (Mtpa) of high-quality metallurgical coking coal, which is sold both domestically and exported through Mackay. As a critical supplier of this valuable resource, ensuring the mine’s operational efficiency is paramount.
Tallawarra B Power Station
Tallawarra Stage B is a 300+ MW expansion of the existing Tallawarra A power station, involving the construction of a 420MW Open Cycle Gas Turbine Power Plant.
Saraji Mine Workshop Extension
CE Group, a leading electrical mining contractor, was engaged by Walz Group to carry out significant electrical works at Saraji Mine.
GRM Riverside Rejects System Refurbishment and Remediation
CE Group were engaged to undertake the rewiring and replacement electrical equipment, cabling and devices on the R1 conveyor, 300T Rejects Bin/Belt Feeder and R2 Conveyor. Electrical connection and assistance for new Radial Stacker, decommission R3 Conveyor and Travelling Rejects Stacker.
Dalrymple Bay Coal Terminal (DBCT) Stacker Project
Dalrymple Bay Coal Terminal, a critical part of Queensland’s coal export infrastructure, is undergoing a significant upgrade to sustain its operational efficiency. As part of this effort, the terminal is replacing its existing rail-mounted stacker machine (ST1) with a newly designed Stacker (ST1A). This upgrade is essential to improve the terminal’s capacity and enhance its long-term reliability.
BMA Goonyella Riverside Mine Dewatering Screens Upgrade
Goonyella Riverside Mine (GRM), a key coal mining operation in the Bowen Basin, is located about 30km north of Moranbah and 190km southwest of Mackay. As a leading electrical mining contractor, CE Group was engaged to upgrade the mine’s Coal Preparation Plant 1 (CPP1) Fine Rejects Dewatering system. This project aimed to rectify a plant bottleneck, increasing production rates and improving system reliability.
The upgrade involved replacing the existing dewatering screen with larger dual screens. This enhancement was critical to addressing a single point of failure (SPF) within the system, which previously halted production when unavailable. By upgrading the system, the mine would not only boost productivity but also ensure redundancy, a key requirement for uninterrupted operations.
As part of this major SMP (Structural, Mechanical, and Piping) and Electrical & Instrumentation (E&I) overhaul, CE Group undertook a wide range of services. These included the supply and installation of new Motor Control Center (MCC) cells, crucial for ensuring the safe and efficient operation of various electrical systems. Additionally, CE Group handled the supply and installation of all pneumatic equipment, power and control cabling, and instrumentation across the site.
The project also required the installation of remote I/O panels and remote local control stations, enhancing the mine’s operational efficiency. These installations allowed for better control and monitoring of key systems, ensuring that production could continue smoothly without unnecessary interruptions.
Throughout the project, CE Group’s extensive expertise as an electrical mining contractor played a vital role in delivering high-quality results. The team worked closely with key stakeholders to ensure the project was completed on time and within budget, all while maintaining strict safety standards.
This successful collaboration at Goonyella Riverside Mine further solidifies CE Group’s reputation as a trusted electrical mining contractor. Their ability to manage complex electrical and instrumentation projects in challenging mining environments ensures that clients can achieve improved operational outcomes while maintaining safety and efficiency.
As a leading electrical mining contractor, CE Group was engaged to upgrade the mine’s Coal Preparation Plant 1 (CPP1) Fine Rejects Dewatering system.
Ammonium Nitrate Storage Bins – Bard Engineering
CE Switchboards, a trusted switchboard manufacturer, was engaged by BARD Engineering to design, manufacture, and supply two 400Amp outdoor main switchboards for ammonium nitrate storage bins.