Mount Morgan Gold Treatment & Rehabilitation Project – Electrical, Instrumentation & Controls Installation

CE Group is delivering electrical, instrumentation and control (EIC) installation works for the Mount Morgan Gold Treatment and Rehabilitation Project in Central Queensland, supporting new mineral processing infrastructure at the former gold mine.

The scope includes HV and LV cabling, transformer and switchroom connections, motor control centre interfaces, power and control cabling, earthing, instrumentation, fibre-optic communications, electrical testing and commissioning support.

The works support the installation and integration of electrical and control infrastructure across multiple processing areas, with staged construction activities coordinated alongside other contractors and equipment suppliers.

Dalrymple Bay Coal Terminal – L3 Conveyor Light & Power Replacement

CE Group provides scheduled high-voltage (HV) and low-voltage (LV) electrical preventative maintenance services for Australian Amalgamated Terminals (AAT) at its Fisherman Islands facility in Brisbane, Queensland, supporting critical electrical infrastructure within an operational port environment.

The scope includes HV substation and transformer inspections, switchgear and protection relay testing, LV distribution board maintenance, emergency lighting testing, thermal imaging, electrical inspections and asset condition reporting.

The works support the ongoing reliability and maintenance of critical electrical assets, helping identify potential faults and inform maintenance planning while accommodating the requirements of the terminal’s 24/7 operations.

AAT Fisherman Islands Terminal – Electrical & Mechanical Maintenance Services

CE Group provides scheduled high-voltage (HV) and low-voltage (LV) electrical preventative maintenance services for Australian Amalgamated Terminals (AAT) at its Fisherman Islands facility in Brisbane, Queensland, supporting critical electrical infrastructure within an operational port environment.

The scope includes HV substation and transformer inspections, switchgear and protection relay testing, LV distribution board maintenance, emergency lighting testing, thermal imaging, electrical inspections and asset condition reporting.

The works support the ongoing reliability and maintenance of critical electrical assets, helping identify potential faults and inform maintenance planning while accommodating the requirements of the terminal’s 24/7 operations.

Bundaberg Port CUI – Electrical & Instrumentation Works

CE Group delivered the electrical and instrumentation installation package for the Bundaberg Port Common User Infrastructure (CUI) project in Queensland, supporting new conveyor infrastructure and upgrades to existing port facilities.

The scope included HV/LV power and control cabling, electrical drives, distribution boards, lighting, earthing, field instrumentation, communications infrastructure, and associated installation, termination and testing works.

The works supported the integration of new materials handling equipment with existing port infrastructure, contributing to the development of permanent conveyor systems for product outloading operations.

Ti-Tree Power Infrastructure Upgrade – HV/LV Design & Construct

CE Group was engaged to deliver high-voltage and low-voltage (HV/LV) electrical infrastructure works for the Ti-Tree Power Infrastructure Upgrade at Willowbank, Queensland.

The scope included design and engineering, HV/LV infrastructure, switchrooms, transformers, control systems and electrical construction works supporting the power infrastructure upgrade.

The project also included testing and commissioning activities, supporting the integration of new and upgraded electrical systems within an operational power infrastructure environment.

Rino Recycling Resource Recovery Facility – Electrical Works

CE Group delivered electrical works for the Rino Recycling Resource Recovery Facility at Pinkenba in Brisbane, Queensland, supporting the development of large-scale resource recovery infrastructure.

The project involved industrial electrical infrastructure supporting advanced processing equipment, automated materials handling systems and equipment integration within the facility.

With the capacity to process up to 475 tonnes of material per hour, the facility integrates wet and dry processing technologies to recover valuable materials from construction and demolition waste.

Kerry Ingredients Plant Protein – Control & Automation Board Upgrade

CE Group was engaged to deliver electrical control and automation infrastructure for the Kerry Ingredients Plant Protein project at its Murarrie facility in Brisbane, Queensland.

The scope included two key electrical packages: a Protein Control Board and an Automation Board Upgrade, supporting new and upgraded control infrastructure within the food and process manufacturing facility.

The works supported the integration of electrical control systems and automation infrastructure, contributing to the facility’s plant protein manufacturing operations.

Krones Nu-Pure Beverages – Electrical Installation

CE Group was engaged to deliver electrical installation works for Nu-Pure Beverages at its Horsley Park facility in New South Wales, supporting new production infrastructure in partnership with Krones AG.

The scope included electrical equipment installation, power and cabling infrastructure, fibre-optic infrastructure, and associated testing and termination works within the food and beverage manufacturing facility.

The works supported the integration of new production equipment and electrical infrastructure, contributing to the facility’s manufacturing operations.

Burpengary East STP Upgrade

CE Group was engaged by Ventia to deliver electrical, instrumentation and control works for the Burpengary East Sewage Treatment Plant Upgrade in Queensland.

The scope includes electrical infrastructure across multiple treatment process areas, including inlet works, pump stations, bioreactor infrastructure, clarifiers, dosing and filtration facilities, and associated plant systems.

The works also include control systems integration, switchboards and prefabricated switchroom solutions, supporting the upgrade of the operational treatment facility.

Peak Downs Mine Coal Thickener Bridge Replacement

Peak Downs Mine

Peak Downs Mine (PDM), operated by BHP Mitsubishi Alliance (BMA), is a coal mine located in Central Queensland, approximately 40 kilometers southeast of Moranbah, or about a 35-minute drive. The project site is situated within the operational Coal Handling and Preparation Plant (CHPP), specifically on the western side of the CHPP, above the Coal (Froth) Thickener. Due to the extensive wear on the existing Coal Thickener Bridge, which has reached the end of its operational life, replacement is now necessary. This critical structure supports a wide range of essential services, including mechanical drives, hydraulic systems, electrical and control systems, the flocculant dosing system, coal slurry and water pipelines, and compressed air infrastructure.

Additionally, the existing bridge provides suspension for the feedwell and thickener raking system, making it an integral part of the CHPP’s overall functionality. As part of this project, the goal is to replace the Coal Thickener Bridge structure and associated infrastructure. To achieve this, all existing equipment will be reinstalled, and any necessary new piping, valves, supports, and cabling will be included as part of the upgrade. In order to minimise downtime, this critical work will be scheduled during the planned FY24 shutdown to ensure the Coal Thickener is restored to full operational status.

This project is crucial for maintaining the reliability and efficiency of the CHPP at Peak Downs Mine, supporting its continuous production. CE Group, as an experienced electrical mining contractor, has been engaged to carry out the electrical and instrumentation (E&I) scope of work. Throughout the project, CE Group will ensure that all electrical systems are replaced, tested, and commissioned in line with industry standards and safety regulations. Moreover, their involvement will support the seamless integration of the newly installed infrastructure, ensuring minimal disruption to the CHPP’s operations.

In addition, CE Group will provide ongoing support during the commissioning phase to guarantee that all systems are functioning optimally. Ultimately, the successful replacement of the Coal Thickener Bridge will enhance the operational efficiency of Peak Downs Mine, ensuring that the CHPP continues to meet production targets while maintaining high standards of safety and performance.