BMA Goonyella Horizontal Belt Filter Installation

Goonyella Riverside Coal Handling Preparation Plant upgrade involved the upgrade of three conveyor drives, motor control centre extension and installation of the 4th belt filter.
Goonyella Riverside Mine is a large open cut coking coal mine in the Bowen Basin. The coal is well known for its great coking characteristics. Much of the coal was such a high grade, the wash plants were often programmed to add ash to meet the contracted export quality targets.
GRM Coal Reclaimer and Stacker Upgrade

Goonyella Riverside Mine (GRM) is a coal mine located in the Bowen Basin approximately 30km north of Moranbah, and 190km southwest of Mackay. The Raw Coal Reclaimer and Raw Coal Stacker at Goonyella Riverside Mine is over 30 years old and much of both machines do not meet latest Standards, Codes and BMA specifications. In effort to rectify this and extend the machines’ operational life, the machines were to undergo an overhaul of electrical and mechanical infrastructure.
The project required significant works during the shutdown. The scope of work encompassed all E&I activities and Mechanical rectification on both machines, which included the following:
- Replace existing switchrooms including temporary works to allow removal
- Replace travel motors, remove existing travel brakes and replace isolators and cabling
- Re-connect existing cables to new switchrooms
- Provide modification to platforms and handrails to accommodate new switchrooms
- Testing and quality assurance
- Provide assistance for commissioning
Exxon Mobil Facility PNG

As an experienced electrical contractor in PNG, CE Group was engaged during the final stages of the project. The aim was to expedite the Electrical Services works to meet the project’s fixed milestones. CE Group’s team was involved in every aspect of the project, working closely on key elements.
Ichthys Onshore Operating Facility

CE Groups Managed Services team was deployed to assist Veolia Energy in the completion of the Mechanical Electrical, BMS and automated control applications of the Ichthy’s Gas Facility after the previously engaged contractor went into liquidation. The operation’s facility of the gas plant consisted of a range of diverse buildings, including a warehouse, hazardous chemical area, cafeteria, research and development area, laboratories and the gas plant’s main control room.
Wynn Palace, Macau

E Group was engaged to provide comprehensive electrical services support for the $4.6 billion Wynn Palace Casino project..
POM Power Station, Port Moresby

CE Group has been engaged to provide labor services for the development of the POM Power Station near Port Moresby. This project is part of the Clough Wartsila Joint Venture and involves several key elements. As a leading electrical contractor in PNG, CE Group’s role is critical to ensuring the station’s success.
Hail Creek Industrial Area Upgrade

CE Group was engaged to perform 3 separate projects forming a major industrial upgrade at Hail Creek Mine, 120 kilometres inland from Mackay, Queensland.
The Hail Creek IAU – Warehouse project involved the supply, installation, testing and commissioning of electrical works for the 2,750m2 warehouse at Hail Creek Mine.
This project included the supply and installation of high bay lighting to suit task and racking requirements, office area lighting and the facility’s general power requirements. CE Group designed, manufactured and installed the Main Distribution Board (DB100) for the Warehouse. CE Groups scope of work included the supply and installation of several 25m Area Lighting Towers, including the associated civil works and the extensive power supply run to the Warehouse.