Infrastructure
Case Studies
Carrara Sports Precinct
CE Group’s Mechanical Electrical team were engaged to provide the complete mech/elec portion of the works for this high profile project. Working in conjunction with Coolmaster and Hansen Yuncken, CE Group was able to successfully design, install and commission the project within tight timeframes and budget restraints.
Robina Town Centre – Stage 2
CE Group Mechanical Electrical team were engaged to deliver the mech/elec portion of the works for this project. The two-level “multi-sensory’ culinary playground to be known as “The Kitchens” was successfully delivered by CE Group on time and on budget for the client.
QR Mayne Facilities Upgrade
CE Group’s General Construction Division was tasked with the electrical design, installation and commissioning for the upgrade of the existing QR Mayne facility at Bowen Hills, Brisbane.
The works included installation of new 1500kVA Transformer, 4 new distribution boards, upgrades to the lighting, power, fire and emergency lighting throughout 2 buildings and a new service platform for the safe access and egress of the rolling stock. The complex program of works required CE Group to demonstrate flexibility whilst completing each section and work closely with QR Staff.
Hayman Island – STP
The existing Hayman Island Sewerage treatment plant is located on the south-western side of the island off the coast of Central Queensland and required to be upgraded to meet the high standards of the resort and the growing tourist activity on the island. CE Group were contracted to design, implement and install a new electrically automated sewerage treatment control system.
CE Group’s engineering team were set some challenging design parameters which focused on the reduction of power consumption and environmental durability with no loss to the operation of the resort throughout the construction phase.
Maleny STP
CE Group was contracted to perform the design and construct scope of works for the electrical and process control services for the new Maleny Sewerage Treatment Plant. The project was an important piece of community infrastructure for Unity Water and the development centered on four main objectives to deliver a safe, reliable, robust and value for money installation for the people of the township of Maleny.
CE Group was responsible for the design, documentation, and certification of the facility which consisted of several new buildings, flow balancing, biological secondary treatment, tertiary filtration, effluent disinfection, chemical dosing and odour management.
Seqwater Chemical Dosing Systems Upgrade, Mt Crosby
The Chemical Dosing Systems Upgrade project upgrades both of Seqwater’s West and East Bank Water Treatment Plant’t chemical dosing systems. A total of 10 chemical dosing skids comprising of approx. 40 dosing pumps are controlled from a new redundant Honeywell C200 HPC (Hybrid Process Controller) at each plant. Chemical makeup and batching systems are also part of the scope of works with the control of all equipment fed out of custom built Control Panels designed, documented, manufactured and installed by CE Group.