Industrial
Case Studies
Buranda TOD
CE Group Mechanical Electrical team were engaged to deliver the mech/elec portion of the works for this project.
300 George Stage 1
CE Group Mechanical Electrical team were engaged to deliver the mech/elec portion of the works for this project.
The hotel will be the first of the three buildings to be constructed and will include a seven-level basement, four-level podium, and 305 rooms.
ACC Retail Ready Processing Facility
Australian Country Choice supply high-quality beef and veal products to Coles Supermarkets and other export customers, maintaining a “plate to paddock” philosophy.
This new facility provides a new retail ready meat packing plant for Queensland and northern New South Wales. The project involved the demolition of disused chillers for the construction of the new facility to accommodate automate storage, cutting and trimming, tray packing and sealing, labeling and carton packing areas.
AMH By Products Plant
Australia Meat Holdings (now JBS Australia) required a By-Products Processing Plant for its processing facility to kill 4.000 cattle per day.
The new plant allows AMH to meet its by-product processing dispatch requirements for current and future projects output to meet environmental requirements and maximise opportunities for meal and tallow in the by-product market.
ACC Boning Room Upgrade
CE Group was contracted to design and construct the installation of electrical services for a new Beef Boning Room. The project was fast tracked to meet the client’s planned shutdown requirements. The timeline given for sixty days included a total of sixteen days to dismantle the existing installation and commission a new facility.
CJ Nutracon Meat and Bone Marrow Processing Plant
CJ Nutracon is a subsidiary of Korean food manufacturing giant, CJ Cheil-jedang, and manufacture and supply products sourced from the Australian food, meat and livestock industries, specialising in the manufacture of enzyme hydrolyzed beef extract, beef leg bone extract and other meat extract products. The project also houses the on site laboratory.
The Toowoomba plant is the result of a relocation of the Oklahoma, USA facility, which was closed down as a result of the mad cow disease in the USA.